The communities of Kramatorsk, Pryiutivka, and Okhtyrka have received completed technical and economic assessments for energy projects designed to make critical infrastructure and educational facilities less vulnerable to power supply disruptions. The development of feasibility studies and project concepts was supported withing a small grant program by NGOs Ecoaction and Alternative, with support from the UK Government as part of the project “Energy of the Future: New Opportunities for Industrial Communities.”
Communities submitted project ideas for which they wanted technical and economic feasibility studies prepared. A selection committee chose three initiatives: a comprehensive energy supply solution for the water utility in Kramatorsk, a combined solar and wind generation system in Pryiutivka, and a smart solar energy management system for a lyceum in Okhtyrka.
Kramatorsk: Solar Power, Cogeneration, and Heat Pumps for the Water Utility
In Kramatorsk, experts worked with Kramatorsk Water Utility, a critical infrastructure enterprise responsible for water supply and wastewater services across the community. Due to ongoing shelling and the constant risk of power outages, the utility requires a solution that can keep essential equipment operating even under unstable electricity supply conditions.
Experts evaluated several technologies simultaneously: a hybrid solar power plant with an energy storage system, a cogeneration unit, and heat pumps. They analysed three possible combinations of this equipment and identified the optimal scenario, which is expected to deliver the lowest electricity costs and the highest return on investment among the options considered. According to the calculations, its implementation could also reduce CO₂ emissions by approximately 500 tonnes per year.
The completed feasibility assessment provides the utility with a solid foundation for securing funding for equipment procurement and further modernisation of its energy supply system.
Pryiutivka: Solar Energy in Summer, Wind Power in Winter
The Pryiutivka community in Kirovohrad region already operates its own hybrid solar power plant. The facility supplies electricity to several critical community assets, including water intake and treatment facilities, as well as the administrative building, which houses the Administrative Services Center, the municipal utility company Vodolii, a primary school, and a sports hall.
During the summer, the solar power plant can fully cover the energy needs of this complex. The challenge arises in winter, when fewer sunny days result in lower electricity generation.
Experts proposed several measures. The simplest one is already being implemented: optimising inverter settings, which has increased the share of electricity consumed from the community’s own generation. The key long-term solution is to install a 40 kW wind turbine, expand battery storage capacity, and create the ability to sell excess electricity generation.
The idea is for solar and wind energy to complement each other. During the summer, the solar power plant would provide most of the electricity, while in winter wind generation would help compensate for reduced solar output. According to expert calculations, such a system could enable the facility to meet nearly all of its electricity needs from self-generated power throughout the year.
Okhtyrka: Making Better Use of Solar Power During School Holidays
In Okhtyrka, Sumy region, the energy solution was developed for Lyceum No. 1, where around 1,000 students and staff study and work every day.
The school already has a 60 kW solar power plant with a battery storage system. However, solar electricity generation and the lyceum’s energy demand do not always coincide. On weekends and during school holidays, when fewer people are present in the building, part of the generated electricity is exported to the grid. Meanwhile, on cloudy days, the school still has to purchase electricity, including for own water heaters.
To address this issue, experts compared several smart energy management systems. These systems can automatically monitor how much electricity the solar power plant generates and how much the building consumes, then redirect surplus energy to where it is needed most.
For example, instead of exporting excess solar electricity to the grid, it can be automatically used for water heating.
As a result of the analysis, experts identified the option that offers the best balance between implementation costs and the efficient utilisation of the school’s existing solar generation capacity.
Why These Assessments Matter for Communities
Unlike smaller projects that can be implemented directly with grant funding, comprehensive energy solutions often require significantly larger investments. Before purchasing equipment, communities need to understand which solution will work best, how much it will cost, and what results it is likely to deliver. This is precisely the purpose of technical and economic feasibility studies.
The next step for the communities is to develop detailed design and cost documentation and secure the funding needed to turn these concepts into fully implemented energy projects.